WP5 – Life-Cycle Analysis (I)

Fraunhofer Institute ICT, in the framework of the Remaghic project, successfully obtained results for the environmental and economic criterion for 6 REE Recycling Process routes. Life Cycle Assessment studies have been performed, following the international standards...
WP4 – Design of the New Recycling Plants

WP4 – Design of the New Recycling Plants

During Task 4.1 a Demonstration System has been developed. A lay-out adapted to the final available location in the industrial facilities has been designed and then, the installation has been manufactured and installed for its validation.
WP1 – The Balance Problem

WP1 – The Balance Problem

One of the activities performed within WP1 is the “REE Balance Problem Analysis” (Task 1.2). The “Balance Problem” is here defined as the balance between the demand by the economic markets and the rare-earth elements (REEs) in ores. The report contains an overview for...
WP3 – REE+Mg Alloying Process

WP3 – REE+Mg Alloying Process

The main objective of this Work Package is the development and characterization of the best possible Mg+REE alloys for the Remaghic Project use cases (Automotive, Bio-technology and Aerospace). These activities have mainly focused on the selection of the rare earths...
18M General Assembly  Meeting

18M General Assembly Meeting

Remaghic Consortium, in which TECNALIA takes part, met to review the progress focused on REE extraction, Mg recycling methodologies and the development of alloying processes. The feedback received from the European Commission was very positive. Now Remaghic needs to...